Top 5 Skills Genset OEMs Are Missing in Their Project Teams

By samara-albadri

Feb 02 — 2026

SHARE POST

Generator OEMs operate in a delivery environment where expectations are increasing and tolerance for disruption is decreasing. Clients expect tighter reporting, clearer sequencing, faster mobilisation, and fewer surprises during commissioning and handover.

The technical capability in many genset OEMs is strong. Engineering knowledge is rarely the problem.

The problem is that project delivery in power generation requires more than engineering. It requires skills that sit between technical delivery, commercial ownership, and stakeholder control.

When those skills are missing, even good engineering teams experience avoidable failure patterns:

  • Delays during installation and commissioning
  • Margin leakage through rework, untracked changes, and poor escalation
  • Client frustration due to inconsistent communication
  • Internal friction between design, operations, and commercial teams
  • Increased pressure on senior leaders who end up firefighting

This article outlines the top five skills missing in genset OEM project teams, why they matter, and what to look for when hiring or developing project capability across generators, CHP, and hybrid power projects.

1) Stakeholder management across client, subcontractor, and internal delivery

Stakeholder management is one of the most underdeveloped capabilities in genset OEM project delivery.

Projects often involve multiple parties:

  • End client (data centre, utility, NHS, public sector, industrial)
  • Main contractor or M&E contractor
  • Civil and electrical subcontractors
  • DNO interfaces where applicable
  • OEM internal teams (design, commissioning, service, commercial)

When a project team lacks stakeholder management skill, the outcome is predictable:

  • Requirements are interpreted differently across groups
  • Decisions are delayed because ownership is unclear
  • Escalations occur late rather than early
  • Progress updates become reactive and credibility drops

What “good” looks like

A strong project operator can:

  • Set expectations early and keep them consistent
  • Translate technical constraints into clear client language
  • Hold subcontractors to scope and sequence without damaging relationships
  • Escalate issues early with options, not problems
  • Maintain documentation discipline so commitments are tracked

2) Sequencing logic for multi-discipline power generation installations

Many genset OEM project teams have experienced engineers but weak sequencing capability.

This matters because power generation projects have dependencies that cannot be guessed. In CHP project delivery and hybrid power projects, sequencing errors cause large downstream disruption.

Sequencing logic includes understanding:

  • What must be completed before energisation
  • Which installation steps are dependent on civils, containment, cable pulls, and terminations
  • How controls, comms, and synchronisation steps connect to physical install readiness
  • Which inspections and sign-offs are gating items
  • How commissioning stages should be staged and de-risked

When sequencing is weak, the same issues appear repeatedly:

  • Subcontractors turn up out of sequence and waste time
  • Commissioning windows are missed
  • Systems are tested before they are ready
  • Controls faults are treated as technical problems when they are process problems
  • Client handover dates slip and cost increases

What “good” looks like

A strong project team can map the end-to-end delivery sequence and identify the high-risk dependency points before the project starts.

3) Commercial awareness inside technical decision-making

Commercial awareness is often assumed to sit in commercial teams. In reality, margin is lost during delivery decisions.

In generator OEM project delivery, margin erosion typically comes from:

  • Scope changes that aren’t documented or priced
  • Design decisions that increase installation time
  • Late changes to cable routes, switchgear interface points, or control philosophy
  • Rework caused by unclear responsibility boundaries
  • Poor variation control when client requirements evolve

A project team can be technically correct and still commercially damaging if they don’t understand:

  • What a change costs in time, labour, and subcontractor variation
  • Which decisions increase risk to programme and liquidated damages exposure
  • How to manage scope creep without relationship breakdown

What “good” looks like

Commercial awareness in project teams means:

  • Treating scope changes as governance events
  • Raising variation discussions early and professionally
  • Making decisions with awareness of cost and programme impact
  • Maintaining margin discipline without compromising safety or quality

4) Proactive risk mitigation and planning discipline

Many teams are strong at solving problems quickly. That is not the same as risk mitigation.

In power generation project risk management, the difference is whether risks are identified and controlled before they become delivery failures.

Common risks in genset OEM and CHP delivery include:

  • Lead times on switchgear, controls panels, or key balance-of-plant
  • DNO interface delays (where applicable)
  • Commissioning readiness gaps (site access, load bank availability, fuel, cooling, exhaust)
  • Subcontractor capacity and quality variation
  • Integration issues between controls, comms, and monitoring systems

What “good” looks like

A risk-capable project team:

  • Runs structured readiness checks
  • Builds contingency plans for high-impact risks
  • Tracks risk owners and mitigation actions
  • Escalates early with options and consequences
  • Avoids “discovering” problems on the day of commissioning

5) Cross-functional communication that prevents internal bottlenecks

OEM project teams often sit in the middle of design, operations, service, and commercial functions.

When cross-functional communication is weak, delivery slows:

  • Design outputs arrive late or incomplete
  • Operations resource planning becomes unreliable
  • Commissioning teams are deployed without full readiness
  • Commercial teams are unaware of scope drift until margin is already lost

The result is internal friction and reduced delivery velocity.

What “good” looks like

Strong cross-functional communicators:

  • Run structured handovers between departments
  • Translate what each team needs, by when, and in what format
  • Keep information consistent across stakeholders
  • Prevent rework by aligning design intent with site reality
  • Maintain disciplined updates without overloading teams

Conclusion

The performance gap in genset OEM project delivery is rarely caused by a lack of engineering knowledge. It is caused by missing skills that sit between engineering, operations, and commercial ownership.

The top five skills genset OEMs are missing in their project teams are:

  1. Stakeholder management
  2. Sequencing logic
  3. Commercial awareness
  4. Risk mitigation
  5. Cross-functional communication

These skills determine whether projects run with controlled delivery or become reactive, especially in CHP project delivery, hybrid power projects, and critical power environments.

If you’re reviewing your project delivery capability or planning to hire into project leadership in the next quarter, you’re welcome to book a call. We can walk you through what other companies in the sector are doing, the capability gaps they’re seeing, and the hiring profiles that lead to the best long-term outcomes.